Urban plot and house extension level surveys

A domestic urban garden or extension level survey costs €400 to €800 ex VAT for ground levels and boundaries, or €750 to €1,350 when neighbouring roof ridges, window sills and sewer manhole inverts are added.

Precision total-station mapping for town gardens, semi-detached rear extensions, mews infills and sloped urban backyards.

Free, no obligation. One local surveyor prices it, not five.

  • €400–€800standard urban garden plot
  • €750–€1,350with neighbour ridges & drains
  • 1:100 / 1:200typical urban drawing scale
  • 2–5 mmtotal-station accuracy
Residential back garden with timber boundary fence, green lawn and neighbouring houses

Why urban plots rely on robotic total stations

Between two-storey rendered gables, party walls and garden trees, satellite signals bounce off masonry and lose vertical precision. On tight suburban plots across Dublin, Cork, Galway or Limerick, surveyors set up a robotic total station to measure hard corners, concrete patios, damp-proof course (DPC) lines and window heights to millimetre accuracy.

Garden levels & boundary walls

Typical ex-VAT fee
€400 to €800
Where it fits
Single-storey rear extensions, garden rooms, stepped patios and retaining walls.

Extension topo + neighbour heights

Typical ex-VAT fee
€750 to €1,350
Where it fits
Two-storey extensions, attic dormers and infill houses facing daylight or overlooking objections.

Full topo + measured building floor plan

Typical ex-VAT fee
€1,100 to €1,900
Where it fits
Deep retrofits and knock-through renovations where internal walls must tie straight to garden levels.

Price my survey

Four quick taps and our price shows before we ask for a phone number. One local surveyor rings you, not five.

An urban plot or extension survey, under 0.25 acre, 2D/3D DWG for planning: €400 to €800 (+23% VAT).

Step 1 of 5

What kind of survey do you need?

Pick the closest match. The surveyor confirms the exact brief.

How the price is worked out

The range reflects typical Irish land surveying rates for field capture (RTK GNSS, robotic total station or UAV drone) plus office CAD drafting in ITM (EPSG:2157) and Malin Head vertical datum. Standard quotes exclude 23% VAT, which applies to professional surveying services in Ireland. Heavy briars, dense tree canopy, lifting stuck road manholes or traffic management on busy national roads can move the final quote. Only a surveyor who inspects your map pin and brief gives a binding written fee.

Four urban details architects always request

  • Existing house DPC and finished floor level. Lets the designer keep level threshold sliders without breaching the damp-proof course.
  • Neighbouring eaves, ridge and rear window sills. Vital for 45-degree daylight tests and preventing council privacy objections.
  • Boundary wall thickness and crank angles. Old terraced walls rarely run perfectly square; exact angles prevent costly foundation clashes.
  • Back-garden gully and inspection chamber depths. Confirms whether a new kitchen island or utility sink can drain by gravity into the existing shore.

Common questions before you book

Do I need a topographical survey for an exempt 40 m² rear extension?

Even where planning permission is not required, an engineer or architect often orders a quick garden level and drain invert survey when the backyard slopes up toward the house or shares a party sewer.

Can the surveyor access a terraced back garden with no side passage?

Yes. Compact robotic total stations and collapsible tripods fit easily through a standard front hall and kitchen door.

How long does an urban extension survey take on site?

Most suburban house plots take 2 to 4 hours on site, with 2D/3D DWG files emailed within 3 to 5 working days.

Are adjoining roofs measured without stepping into next door's garden?

Yes. Reflectorless EDM lasers built into modern total stations shoot ridge tiles, chimneys and upper window cills safely from your own garden.

All survey pages and technical guides

Total station and optical surveying prism mounted on twin yellow tripods

Check your survey cost before a crew books in

Pick the survey type, approximate acreage and deliverables. When you want a written fee, your brief goes to a single land surveyor in your county.