Road sightline and rural entrance surveys

A standalone rural road sightline and entrance survey costs €400 to €750 ex VAT, or €150 to €400 when added onto a full house site topographical survey. Councils test clear visibility from a 2.4 m setback in both directions.

Measuring stopping sight distances along Irish country roads to satisfy county council road engineers under TII DN-GEO-03060 and DMURS.

Free, no obligation. One local surveyor prices it, not five.

  • 2.4 mstandard X-distance setback
  • 90 msightline at 60 km/h road
  • 145–160 msightline at 80 km/h road
  • €400–€750standalone sightline survey
Irish rural country road lined with mature hedges and an 80 km/h bilingual speed limit sign

Irish stopping sight distances by road speed

Lack of verifiable road sightlines is one of the single biggest causes of planning refusals on rural Irish one-off houses. Under Transport Infrastructure Ireland (TII) standards DN-GEO-03060 and DN-GEO-03031, plus DMURS in lower-speed zones, an entering driver seated 2.4 m back from the carriageway edge must have an uninterrupted view of approaching traffic across a vertical envelope between 1.05 m and 2.00 m above road level.

50 km/h70 mVillage / urban approach
60 km/h90 mLocal rural speed limit
80 km/h145–160 mRegional / rural road
Setback X2.4 mMinor rural access

Always verify your specific county development plan: some local authorities accept a 2.4 m setback on quiet local tertiary roads while demanding 3.0 m or 4.5 m on busier regional corridors, or allow reduced sightlines backed by a calibrated 85th-percentile traffic speed survey.

Price my survey

Four quick taps and our price shows before we ask for a phone number. One local surveyor rings you, not five.

A one-off house site survey, 0.5 to 1 acre, with road sightlines and invert levels: €750 to €1,750 (+23% VAT).

Step 1 of 5

What kind of survey do you need?

Pick the closest match. The surveyor confirms the exact brief.

How the price is worked out

The range reflects typical Irish land surveying rates for field capture (RTK GNSS, robotic total station or UAV drone) plus office CAD drafting in ITM (EPSG:2157) and Malin Head vertical datum. Standard quotes exclude 23% VAT, which applies to professional surveying services in Ireland. Heavy briars, dense tree canopy, lifting stuck road manholes or traffic management on busy national roads can move the final quote. Only a surveyor who inspects your map pin and brief gives a binding written fee.

What the surveyor captures along the carriageway

  • Horizontal bends and vertical crests. A hump in the tarmac 80 m down the lane can conceal an oncoming car even when the hedges are trimmed back.
  • Exact roadside bank, wall and hedge lines. Shows precisely how many metres of bank must be set back inside your own landholding to open the splay.
  • Third-party frontage limits. Proves whether the visibility triangle stays strictly inside your red-line boundary or crosses a neighbour's hedge needing a letter of consent.
  • Road drainage, poles and roadside trees. Flags ESB poles, telecom chambers or mature trees sitting inside the sight triangle before design submission.

Common questions before you book

What does a 2.4 m by 90 m sightline mean?

Standing 2.4 m back from the edge of the public road along the centre of your driveway entrance, you must have clear horizontal and vertical sight for 90 m left and 90 m right along the nearside road edge.

What if the sightline triangle crosses my neighbour's roadside ditch?

Your council will normally require signed written legal consent from that adjoining landowner allowing the hedge to be lowered and maintained, or you must relocate the entrance along your own frontage.

Why do surveyors measure road levels as well as hedge lines?

Vertical visibility matters just as much as horizontal curves. Measuring road centreline and channel spot levels every 10 m to 20 m lets your engineer plot vertical crest sightlines at 1.05 m eye height.

Can an 85th-percentile speed survey reduce the required sightline?

On narrow winding local roads where actual vehicles travel well below the posted limit, some Irish councils accept a certified traffic speed survey to justify a shorter stopping sight distance.

All survey pages and technical guides

Total station and optical surveying prism mounted on twin yellow tripods

Check your survey cost before a crew books in

Pick the survey type, approximate acreage and deliverables. When you want a written fee, your brief goes to a single land surveyor in your county.